
"If you're gonna do it, do it right"

Rough Plumbing Installation

Rough plumbing system installation refers to the initial phase of plumbing installation in a building or structure. It involves the installation of the plumbing system's main components, such as pipes, drains, vents, and water supply lines, before the walls and other finishing materials are added.
During rough plumbing installation, the plumbing system is laid out according to the building's design and blueprints. The process typically begins with determining the optimal positioning of the main water supply line, which connects the building to the public water supply or a private well. From there, pipes are installed to distribute water to various fixtures and appliances throughout the building, including sinks, toilets, showers, bathtubs, and water heaters.
Drainage pipes are also installed to carry wastewater away from the building. These pipes are connected to fixtures and appliances and are designed to allow the free flow of water and waste to the main sewer line or a septic system. Vent pipes are added to the system to allow for the proper venting of sewer gases and to maintain neutral air pressure within the plumbing system.
During rough plumbing installation, the pipes are typically installed within the walls, floors, and ceilings of the building. Once the rough plumbing is completed, it is concealed by finishing materials, such as drywall, tiles, or other wall coverings.
It is important to note that rough plumbing installation should only be carried out by professional plumbers who have the necessary expertise and knowledge of local plumbing codes and regulations. This ensures that the plumbing system is installed correctly and meets the required standards for safety and functionality.